Files
ZitPlane/docs/PHASES.md
T

32 lines
2.4 KiB
Markdown

# Phase register and scope locks
Implement one explicitly approved phase at a time. Keep out-of-scope files, existing authentication machinery and production systems unchanged.
## P01 — Foundation (COMPLETE)
- Baseline commit `8f54ccb30426f2955472c0cd40fb94d0b18e86ac`.
- Initial monorepo folder structure, docs, project Git identity and clean commit completed.
## P02 — ZITADEL local backend (APPROVED 2026-11-22)
- **Allowed source writes:** `core/backend/zitadel/**`, `deployment/docker/compose.backend.dev.yaml`, `.env.example`, backend-focused `tests/**`, and narrow `docs/**` / `README.md`.
- Official versioned ZITADEL v4 backend image, local PostgreSQL persistence, secure random dev secret generation, first-admin bootstrap and health checks.
- Official prebuilt Login V2 image as a **runtime dependency only** (v4 Admin Console login requires it); no Login V2 source import.
- No backend Go source vendoring, UI redesign, public domain, Coolify deploy, production keys, remote push or changes to unrelated files.
- Verify: static focused test/patch audit; with Docker available, live startup/ready/Admin Console, persistent DB after restart and shutdown.
- **Execution evidence:** Docker CLI/Desktop absent on connected Windows PC; live Compose startup, admin login and persistence remain BLOCKED, not passed. Local static verification results and Git commit are recorded upon phase closure in `docs/P02-EVIDENCE.md`.
- Existing unrelated untracked `AI_INSTRUCTIONS.md` must remain untouched.
## P03 — Login V2 import (proposed, NOT approved)
Import one compatible upstream commit and necessary workspace/dependencies under an exact approved scope; verify original behavior. No visual redesign. Do not claim P02 runtime integration was verified if Docker remains unavailable.
## P04 — Account portal foundation (proposed, NOT approved)
OIDC-protected basic account self-service skeleton; no fake production authentication.
## P05 — Integration (proposed, NOT approved)
Local development, shared UI tokens as needed, production-safe Docker topology, routing drafts, tests/docs. No live deployment.
## P06 — UI redesign (proposed, NOT approved)
Compact login and account UI, accessibility, responsive design and scoped regressions. Protected authentication semantics unchanged.
## P07 — Production deployment (proposed, NOT approved)
Coolify, HTTPS, secrets, backups, durable storage and focused production readiness; explicit approval required.