docs(temp): record P01 blocked acceptance evidence without closing phase

This commit is contained in:
victorsteele428 committed 2026-11-22 01:42:29 +00:00
1 parent 90fce0629a
commit 023ccfff68
3 files changed
+15 -2

No files matched your search

+10 -1
View File
@@ -7,7 +7,7 @@ Scope: documentation-only kickoff. Any future phase must update this log **after
| Phase | Status | IDs / function | Changed source | Verified CI evidence | Commit / remote sync |
|---|---|---|---|---|---|
| P00 Notes / freeze | COMPLETED (documentation only) | `001–006` docs, source baseline and exact scope | `notes/**` only | 6 Markdown files; balanced fences; staged diff `--check` PASS | Documentation commit containing this file; remote SHA verification recorded in session handoff |
| P01 Tests & lockfile | NOT STARTED | CI-01,02,03,04,05 | None | Not run | — |
| P01 Tests & lockfile | BLOCKED — partially implemented; NOT CLOSED | CI-01,02,03,04,05 | 16 P01 allowlisted paths on disposable branch `p01-ci-verification-20261122`; no runtime source changed | Gitea #58 FAIL: Windows and Linux `npm ci` report missing `@tybys/wasm-util@0.10.5`; tests and typecheck NOT EXECUTED | CI snapshot `90fce0629a752dd2916d8d3a2afeaf2c52ed6cbb`; not merged to main or synced |
| P02 Ingestion reliability | NOT STARTED | Conditional R-01,02,03 | None | Not run | — |
| P03 CI/Docker/security | NOT STARTED | CI-06,07,08; release gates | None | Not run | — |
@@ -43,6 +43,15 @@ Historical baseline code stayed frozen through these CI workflow changes. Curren
- MEMORY.md cross-IDE handoff text (copyable):
`[DataStack P0X] Baseline=<SHA>; findings=<IDs>; scope=<exact paths>; CI=<run + exit>; commit=<SHA>; remote sync=<all 3>; phase=CLOSED; next=P0Y; production deployment=unchanged.`
## P01 attempted implementation & gate outcome (2026-11-22)
- Frozen source baseline remains `d725841ebc828d58cbe90f517da9e600f23c4630`; latest source HEAD before P01 was documentation commit `d8ac96e39dad4ea3b241c1d2f16f959c5215701e` on all three remotes.
- Disposable CI commit `90fce0629a752dd2916d8d3a2afeaf2c52ed6cbb` contains **16 P01-allowed paths**: `bun.lock` deletion, `package-lock.json` optional/native metadata closure (+67 entries, no existing version or root-manifest change), 14 scoped test files, and `.gitea/workflows/datastack-ci.yml` clean-install/phase-filter changes. No application runtime source/UI/SDK/Docker changes.
- Gitea run: https://dev.ivib.cc/vibtools/DataStack/actions/runs/58; overall **FAIL**, terminal. `windows-compatibility`, `node-regression`, `quality`, `production-build` all failed during clean `npm ci`: `Missing: @tybys/wasm-util@0.10.5 from lock file`. The Python and Docker jobs were intentionally skipped for P01. **No current TypeScript test, strict typecheck, ESLint or build PASS may be claimed**.
- Root issue likely parallel incompatible transitive requirement of `@tybys/wasm-util`; inspect `node_modules/@napi-rs/wasm-runtime` vs `node_modules/@tailwindcss/oxide-wasm32-wasi` in lock and install exact requested transitive version under correct nested path without changing existing pinned entries. Then verify npm clean-install on both platforms and rerun focused P01 acceptance once after repair; do not blindly override lock integrity.
- Local original Windows device's VARUA connection reached monthly call quota; local changes were staged via safe squash on `main` but **no P01 main commit/push** occurred. A separate connected desktop did not have this workspace. Do not claim local/3-remote post-P01 sync until verified.
- Completed implementation phases **0/3**, remaining **3**. P01 status BLOCKED, P02 must NOT start until P01 passes and closes. Preserve all working changes; do not force push or deploy.
## Status transition rules
- OPEN -> IN PROGRESS only with explicit approval and baseline SHA match.
+4
View File
@@ -42,6 +42,10 @@ Source baseline: `d725841ebc828d58cbe90f517da9e600f23c4630`. This is an **implem
- MCP: disabled by default, read vs write permissions, bearer hashing, IP allowlist, sandbox traversal and symlink reject, no secret emission.
- Do not run these failure injections against `https://data.ivib.cc/`. Use disposable CI fixtures/data directories/Redis containers only.
## P01 dependency-install blocker note (2026-11-22)
Gitea run #58 failed before application error-handling tests because clean npm install found an unresolved transitive lock entry: `@tybys/wasm-util@0.10.5`. No runtime error-handling paths were changed or re-verified in this run. Existing source-level handler inventory remains unchanged; P02 fault-injection gates are **NOT STARTED**.
## Change control
Any new error code, status, SDK public exception or alert flow is **feature/API behavior change**: STOP and request explicit new scope approval. This register is documentation for deciding whether a new handler is warranted, not blanket authorization to add handlers.
+1 -1
View File
@@ -41,6 +41,6 @@ After EACH P01/P02/P03 close, amend only affected table rows:
Do not mark "actual working" simply because a patch compiled. Distinguish source, CI, and actual deployment.
## Change log
- P00: No feature added/modified. `notes/**` documentation only. 0/3 implementation phases completed.
- P01: pending.
- P01: **BLOCKED / NOT CLOSED**. Only test/harness/lockfile patches on disposable branch `p01-ci-verification-20261122`; no application feature added/removed/modified. Gitea CI #58 FAIL at Linux and Windows `npm ci` due missing `@tybys/wasm-util@0.10.5`; tests/typecheck/build did not execute. No P01 production readiness claim. Resume with exact nested package resolution and focused acceptance, then update this register with real PASS evidence.
- P02: pending.
- P03: pending.