docs(ci): close P05 SEC-02 A01 after successful run 89

This commit is contained in:
Vib Tools committed 2026-11-22 08:39:26 -08:00
1 parent ff4c58ed86
commit f423c69654
18 files changed
+64 -17

No files matched your search

+1 -1
View File
@@ -14,6 +14,6 @@ This is the chronological **index**. Phase-specific scope/implementation evidenc
| 2026-11-22 | P05-CI-03 | Backend-only Gitea verification of portless Compose, 4 services, Postgres persistence, OIDC/JWKS and safe cleanup | **Run #86 SUCCESS** on `03fb589`, no unrelated suites rerun; [evidence](P05-CI-03.md) |
| 2026-11-22 | P05-SEC-01 | Next.js 16.4.6, compatible OTel instrumentation, frozen locks and strict advisory gates | Run #87: 3 PASS/1 FAIL; 17/19 prior findings no longer reported, 2 Moderate Login blockers. [Evidence](P05-SEC-01.md) |
| 2026-11-22 | P05-SEC-02 | Seven scoped parent overrides for glob/minimatch, pinned PNPM lock; one focused Gitea run | Run #88: Login security 0 findings PASS, build gate FAIL before frozen install on CI helper false-positive. Post-run regex fix unverified; [evidence](P05-SEC-02.md) |
| 2026-11-22 | P05-SEC-02-A01 | Dedicated one-run final acceptance of already-corrected CI parser, unchanged Login lockfile and seven overrides | No additional source changes; [pre-run plan](P05-SEC-02-A01.md), acceptance pending |
| 2026-11-22 | P05-SEC-02-A01 | One-run final acceptance of corrected CI parser and unchanged Login lockfile/seven overrides | **Run #89 SUCCESS** on `ff4c58e`: frozen install, standalone build and upstream 1219/1219 tests PASS; audit 0 Moderate/High/Critical; Account jobs skipped. [Evidence](P05-SEC-02-A01.md) |
Rules: Append new phases or fixes; never silently rewrite a past result. Separate **implemented**, **verified**, **blocked**, and **proposed**. Never log a user secret or personal data.
+1 -1
View File
@@ -10,7 +10,7 @@
| [P05-CI-03.md](P05-CI-03.md) | Backend-only pre-change scope, disposable CI run evidence and exact acceptance result | P05-CI-03 / Run #86 SUCCESS; acceptance complete |
| [P05-SEC-01.md](P05-SEC-01.md) | Pre-change security scope, remediation, exact advisory evidence, one CI run and closure | P05-SEC-01 / Run #87 completed, 2 Moderate open |
| [P05-SEC-02.md](P05-SEC-02.md) | Exact root chain, seven PNPM parent overrides, one focused Gitea CI and closure evidence | P05-SEC-02 / Run #88 security PASS, build blocked; parser post-run patch unverified |
| [P05-SEC-02-A01.md](P05-SEC-02-A01.md) | Single-run Login-only final frozen/build/unit/security acceptance, scope lock and evidence | P05-SEC-02-A01 / pending one focused Gitea run |
| [P05-SEC-02-A01.md](P05-SEC-02-A01.md) | Single-run Login-only final frozen/build/unit/security acceptance, scope lock and evidence | P05-SEC-02-A01 / Run #89 SUCCESS, accepted |
| [CHANGELOG.md](CHANGELOG.md) | Short append-only chronological phase log and links to detailed reports | DOCS-01 / active |
Update this manifest whenever any direct child file or directory changes. Use **actual source state**; a planned file must be labeled planned, not present.
+20 -2
View File
@@ -3,7 +3,7 @@
**Date:** 2026-11-22
**Approved Gitea main baseline:** `7655dbdcb48c49aab8f3bf97aab8f1867f129531`
**Previous tested SHA:** `66cfed5a8b6bd5845b229c9934695e307f9a0775`, Gitea [Run #88](https://dev.ivib.cc/vibtools/ZitPlane/actions/runs/88)
**Pre-change status:** APPROVED, SCOPE LOCKED, Gitea acceptance PENDING. This report was written **before any P05-SEC-02-A01 source edit**.
**Phase status:** ACCEPTED/PASS — one focused Gitea Run #89 completed SUCCESS. This pre-change plan was written before implementation; terminal evidence appears below.
## Approved exact scope
@@ -24,4 +24,22 @@
**FULL PASS** only if on the same tested SHA: exact seven-scoped override contract PASS; `pnpm install --frozen-lockfile` PASS; official Login Nx proto/client and standalone Next build PASS; upstream Login unit suite PASS with actual counts; Login live registry audit **0 Moderate/High/Critical**; Account jobs SKIPPED intentionally; CI run overall SUCCESS and no unrelated source changes. Without these, phase remains BLOCKED.
**CI evidence ledger:** PENDING the one authorized Gitea Actions run.
**CI evidence ledger:** COMPLETED in Gitea Run #89; see terminal evidence below.
## Terminal Gitea Run #89 — accepted 2026-11-22
**One focused run:** [Gitea Run #89](https://dev.ivib.cc/vibtools/ZitPlane/actions/runs/89), manual `workflow_dispatch` with `login_only=true`, branch `main`, **tested exact source SHA `ff4c58ed861474061c8f045be3a9f0752caf6ca0`**. Started 2026-11-22 16:30:28 UTC and completed 16:34:54 UTC. Overall `status=completed`, `conclusion=success`. **One run only**; no repeat of earlier Account/backend suites.
| Job | Gitea ID | Final | Actual evidence |
| --- | ---: | --- | --- |
| Account build | #193 | **SKIPPED intentionally** | `login_only=true`; Account had separate Run #87 acceptance |
| Login frozen/install/build/units | #194 | **SUCCESS** | Existing corrected selector parser `ZITPLANE_EXACT_SEVEN_PARENT_OVERRIDES_PASS`; `ZITPLANE_GLOB_MINIMATCH_PATCHED_LOCK_CONTRACT_PASS`. Pinned `pnpm@10.30.3 install --frozen-lockfile` verified `Lockfile is up to date`, installed **1121** packages and emitted `ZITPLANE_SECURITY_LOGIN_FROZEN_INSTALL_PASS`. Original Nx proto/client/Login Next.js 16.4.6 standalone build and artifact check `ZITPLANE_SECURITY_LOGIN_BUILD_PASS`. Unmodified upstream Vitest **84/84 files and 1219/1219 unit tests PASS**, `ZITPLANE_SECURITY_LOGIN_UNIT_PASS` |
| Account production security | #195 | **SKIPPED intentionally** | `login_only=true`; Account production audit previously returned zero vulnerabilities in Run #87 |
| Login production security | #196 | **SUCCESS** | `pnpm audit --prod --audit-level high` gate PASS; live registry `No known vulnerabilities found`; `PNPM_ADVISORY_RECORDS=0`; metadata `info=0, low=0, moderate=0, high=0, critical=0`; `ZITPLANE_PNPM_ZERO_MODERATE_HIGH_CRITICAL_PASS` |
**Final verdict:** **P05-SEC-02-A01 ACCEPTED/PASS**. The source-only corrected CI contract from previous phase now runs successfully in a disposable Gitea runner. The two prior Moderate `glob` / `minimatch` advisories do not reproduce, and exact frozen dependency graph is compatible with the upstream Login production build and 1,219 unit cases. **This does not establish live authenticated OIDC browser callback, MFA, session/cookie production integration, Console human sign-in or production deployment**. Future dependency advisories remain possible; this is a point-in-time audit.
**Scope/security compliance:** Pre-run planning/documentation only (12 files), **zero CI/helper/application source edits** in A01, **zero dependency manifest/lockfile changes** and 0 secrets. Source inventory 734/734 tracked files, all five direct-folder manifests exact. Old unrelated untracked `AI_INSTRUCTIONS.md` left untouched. No local builds/tests/dev server/Docker. One Gitea cycle, no reruns. The final documentation-only closure commit is not the SHA that Run #89 tested.
**Next phase proposed:** `P05-OIDC-01` isolated real user/client **OIDC positive and negative end-to-end acceptance**, requiring separate explicit approval and disposable provisioning. Its scope must preserve protected auth logic, genuine ZITADEL challenge/PCKE/nonce/state semantics and safe resource cleanup; never call source-level metadata checks a completed user login.