ci: introduce ZitPlane P05 verification foundation
This commit is contained in:
1 parent
7ecf531697
commit
42b79362c1
32 files changed
+1731
-471
No files matched your search
@@ -0,0 +1,30 @@
|
||||
# P05-CI-01 — Gitea Actions verification
|
||||
|
||||
Date: 2026-11-22
|
||||
Source baseline: `7ecf53169776cc7f08af3dde6fe4b4492acf3ea1`
|
||||
State: **WORKFLOW SOURCE PREPARED; DISPATCH/RESULTS PENDING**.
|
||||
|
||||
## How to run
|
||||
|
||||
In Gitea `vibtools/ZitPlane`, open Actions > **ZitPlane P05 CI Verification** > Run workflow, select `main`. This is **manual only** and requires an existing `ubuntu-latest` runner with working Docker support. The workflow file is `.gitea/workflows/p05-ci.yml`.
|
||||
|
||||
No local PC tests, builds, Docker or dev servers are performed by this phase. The workflow jobs execute only inside Gitea runner job containers.
|
||||
|
||||
## Gates
|
||||
|
||||
- **account** — Account Portal pinned npm lock, dependency installation, TypeScript and Next.js production build.
|
||||
- **login** — upstream source's pinned pnpm frozen workspace install, Nx proto/client/Login V2 build and upstream Login unit suite.
|
||||
- **security** — npm/pnpm production advisory triage; HIGH/CRITICAL advisories fail the gate.
|
||||
- **backend** — disposable Docker preflight, P02 Python helper contracts, ZITADEL/PostgreSQL/prebuilt Login/Traefik stack and OIDC discovery/JWKS, then cleanup.
|
||||
|
||||
**Not proved even by all four jobs passing:** complete interactive Account Portal OIDC callback/session, new user signup/MFA/passkeys, Admin Console login, global logout, production host/TLS/routing. These need a separate explicitly approved and fully disposable end-to-end integration test phase.
|
||||
|
||||
## Safety
|
||||
|
||||
Runner creates ephemeral secrets only. No production credentials or live user data. CI refuses to touch an existing Docker network with the fixed P02 name. Always cleanup is configured; if the runner itself crashes, disposable resources may require operator cleanup **after confirming exact project ownership**. No push/PR trigger, publish, release or deploy.
|
||||
|
||||
## Results
|
||||
|
||||
**No results have been verified at documentation creation time.** Fill with actual Gitea run ID, SHA, individual gate results and exact failures; do not infer PASS from static source or use historical runs from other repositories as ZitPlane acceptance.
|
||||
|
||||
Developer map: `project/CI-ARCHITECTURE.md`. Phase notes and root-cause evidence: `notes/P05-CI-01.md`.
|
||||
Reference in new issue
Block a user