docs(P04-S01C): verify 7/7 terminal CI acceptance and source scope [skip ci]
This commit is contained in:
1 parent
6d6f6ca2ef
commit
2aa652bdb2
6 files changed
+44
No files matched your search
@@ -125,3 +125,9 @@ PostCSS resolution fixed within disposable test copy, with audit high/critical 0
|
||||
## P04-S01C security gate and error contract — 2026-11-22
|
||||
|
||||
SEC-01 candidate remediation verified: Next 15.5.29/Cloudcmd 19.24.0 unchanged, PostCSS 8.5.33 deduped, nested vulnerable PostCSS removed without unrelated dependency integrity/metadata drift. Focused CI #85 read-only audit: full affected packages moderate=24/high=0/critical=0; runtime moderate=22/high=0/critical=0, and `DATASTACK_RUNTIME_SECURITY_HIGH_CRITICAL_ZERO` succeeded. New gate fails on incomplete severity counts and any runtime high/critical. Moderate Cloudcmd transitive issues intentionally remain P04-S02. No JWT/auth, HTTP/socket error codes, Redis durability, CSV replay, SDK/API/UI or production health changes; Windows CI still queued and publication pending.
|
||||
|
||||
## P04-S01C FINAL CI acceptance (7/7) — 2026-11-22
|
||||
|
||||
Gitea CI #85 https://dev.ivib.cc/vibtools/DataStack/actions/runs/85 COMPLETED/SUCCESS; tested implementation SHA c759be990c032c2474d2d0bad519c643dec11a3a; later changes to candidate are documentation only. All seven jobs terminal SUCCESS: node-regression (Linux committed-lock npm ci and exactly 24/24 TypeScript suites); python-regression (Ran 14 tests, OK); quality (strict tsc and ESLint); production-build (Next 15.5.29 standalone, 22/22 pages); docker-image-build (three isolated BuildKit ingestion/web/proxy images); windows-compatibility (Windows committed-lock npm ci and Node SDK build, job #182, terminal SUCCESS); security-audit (runtime moderate=22 high=0 critical=0; full moderate=24 high=0 critical=0; DATASTACK_RUNTIME_SECURITY_HIGH_CRITICAL_ZERO). Single Gitea acceptance run used, no additional broad reruns.
|
||||
|
||||
Security improvement: remove Next nested vulnerable PostCSS and enforce runtime high/critical fail gate. Existing 22 moderate runtime affected-package entries remain, not a security-clean claim for all severities. No change to runtime error codes/auth/API contracts. CI fully accepted; publication not yet asserted in these pre-merge notes. Final phase CLOSED requires one squash merge of PR #5 into Gitea main and verified identical tracked content across Gitea/GitHub/GitLab; record actual new SHAs in terminal report. Production release remains NO-GO pending P04-S02 moderate vulnerability triage and separately authorized live readiness verification.
|
||||
Reference in new issue
Block a user